Contract Type: Tax & Royalty

FIeLD DEVELOPMENT Project Summary

NEW TECHNOLOGY APPLICATION OF MULTI-LATERAL HORIZONTAL WELL DEVELOPMENT

  • Our principals ran proprietary tool applied to drill first lined multi-lateral horizontal well
  • Successfully drilled from one well bore 3 open hole sections and 2 slotted horizontal liners
  • Average well productivity simulation expected to result in 150-200 bopd
PROJECT LOCATIONDURATIONSTART DATECOMPLETION DATE
Saskatchewan Canada OngoingMay 2023Ongoing

Key Takeaways Success

  • Well successful drilled multi-lateral with total lateral length over 1,500 meters in less than 14 days
  • Junction tool successfully deployed two run two liners
  • Well production and operations optimization ongoing
  • Additional well development of multi-lateral planned in 2024

Contract Type: FEED, Selection of EPCC Contractor
Client: SONATRACH

EPC Project Summary

FEED STUDIES SERVICES

  • FEED Study Services for New Urea Formaldehyde Unit Concentrated and Condensed “UFC85” (40,000 MT/year) at the CP1Z Complex – Arzew.
PROJECT LOCATIONDURATIONSTART DATECOMPLETION DATE
Algeria 20 MonthsJun-24Feb-26

Key Takeaways Success

  • Efficient Front-End Engineering Design (FEED): Delivered a thorough FEED, enabling the selection of an EPCC contractor within agreed time and quality standards.
  • Budget and Schedule Adherence: Executed the project within budget and met scheduled targets, maximizing resource efficiency.
  • Client Empowerment through Knowledge: Enhanced client understanding of UFC85 and formaldehyde technology, empowering informed decision-making and future planning.
  • Optimized Resource Utilization: Carefully selected a qualified and cost-effective supplier, optimizing project resources and delivering value for the client.

Contract Type: Detailed Design
Client: Kurdistan Pipeline Company Pte Ltd

EPC Project Summary

DETAIL DESIGN OF PERMANENT POWER SUPPLY THROUGH OVERHEAD LINE (KPS2 TO RETM) AND ESTABLISHMENT OF NEW SUBSTATION IN RETM

  • Conduct OHTL engineering, covering but not limited to:
    • 11KV OHL Designs;
    • 11Kv Integrated Substation at RETM;
    • Electrical Cabling between the OHL and the Integrated New Substation.
PROJECT LOCATIONDURATIONSTART DATECOMPLETION DATE
Iraq5 MonthsNov-23Apr-24

Key Takeaways Success

  • Enhanced Power Distribution: Centralized power distribution via overhead lines and a new substation improves reliability and reduces operational challenges, enhancing power integrity.
  • Operational Efficiency: Streamlined operations with a centralized substation design and essential components offer a single point of control, maximizing operational efficiency.
  • Safety Integration: Integration of auxiliary systems enhances safety measures, promoting a safer working environment and improving overall security.
  • Scalable Design: The design’s flexibility enables scalability and adaptability to future expansion needs, ensuring long-term efficiency of the power supply system.

Contract Type: Study
Client: Dar Petroleum Operating Company

EPC Project Summary

PROVISION OF THIRD PARTY TECHNICAL REVIEW FOR PALOCH DE-BOTTLENECKING (DBN) FACILITIES

  • Evaluate the Process Issues with the aim of de-bottlenecking the facility to achieve the original design intent. Conduct Site Visit and Sampling to inform de-bottlenecking recommendations.
  • Adhere to DPOC Standards & Codes, South Sudan’s Rules, Regulations, and Laws, and International Standards and Best Practice.
PROJECT LOCATIONDURATIONSTART DATECOMPLETION DATE
South Sudan10 MonthsJul-23April-24

Key Takeaways Success

  • Safety-Centric Approach: Technical review and verification prioritize safety, reliability, and integrity, ensuring optimal performance of Debottlenecking facilities.
  • Operational Efficiency: Maintenance of original design intent enhances safety and reliability, optimizing operations and reducing downtime for increased efficiency.
  • Guided Analysis: Utilizing various documents and reports, the study provides guidelines for third-party contractors to thoroughly analyze design and operating conditions.
  • Regulatory Compliance: Systematic evaluation based on site conditions and international standards ensures adherence to regulatory requirements, facilitating a comprehensive assessment of the project.

Contract Type: Detailed Design
Client: Kurdistan Pipeline Company Pte Ltd

EPC Project Summary

DETAIL DESIGN ENGINEERING OF RETM-KRS2 PIPELINE

  • The Services to be provided under the Contract may include, but not be limited to:
    • Project management;
    • Detailed Engineering for the 24 inch, 16 Km Pipeline between RETM & KRS2;
    • Conduct Geo and Topo Survey;
    • Upgrade the RTU/SCADA Systems;
    • Preparation of the PC Scope of Work;
    • Preparation of the PC Cost Estimate;
    • Preparation of the PC Schedule; Preparation of the Project Dossier
PROJECT LOCATIONDURATIONSTART DATECOMPLETION DATE
Iraq9 MonthsJul-23Mar-24

Key Takeaways Success

  • Comprehensive Project Management: Contractor oversees project management from initiation to completion, ensuring adherence to contract provisions and timely issuance of the Completion certificate, ensuring efficient project delivery.
  • Document Integrity Assurance: Thorough verification of Feasibility Study Dossier documents ensures completeness, accuracy, and adequacy, identifying and resolving major gaps promptly for seamless project progression.
  • Precise Engineering and Design: Detailed engineering and design preparation, including RFQs for material procurement, aligns with project specifications, ensuring the Work meets all requirements effectively.
  • Accurate Site Assessment: Site verification and surveys, incorporating actual conditions into documentation, including underground and aboveground surveys, enable the identification of existing and potential hidden service lines, enhancing the execution plan’s accuracy.

Contract Type: Engineering (GSA)
Client: TAQA Atrush B.V.

EPC Project Summary

CALL-OFF CONTRACT FOR THE PROVISION OF ENGINEERING CONSULTANCY SERVICES

  • The Services to be provided under the Contract may include, but not be limited to:
    • Feasibility studies and frontend engineering studies;
    • Detailed design activities, including preparation of procurement documentation (invitation to tender packages) and technical bid evaluations;
    • Provision of personnel to work within TAQA’s organization;
PROJECT LOCATIONDURATIONSTART DATECOMPLETION DATE
Iraq  24 months
  (Extended)
May-23May-25

Key Takeaways Success

  • Optimized Project Planning: Comprehensive feasibility and frontend engineering studies assess project viability, facilitating optimized planning for efficient execution.
  • Streamlined Design Processes: Detailed design activities and thorough procurement documentation preparation, coupled with technical bid evaluations, ensure streamlined processes and quality control throughout the project lifecycle.
  • Efficient Team Collaboration: Deployment of skilled personnel fosters seamless collaboration within TAQA’s organization, promoting efficient teamwork and knowledge exchange for project success.
  • Enhanced System Functionality: Upgradation of DCS/ESD/FGS Systems enhances functionality and operational efficiency, aligning with modern standards and regulatory requirements to ensure optimal performance.

Contract Type: Engineering (GSA)
Client: RN-BATIL PTE. LTD

EPC Project Summary

PROVISION OF ENGINEERING AND DESIGN SERVICES FOR THE BLOCK 8 FIELD

  • Concept, FEED and Detailed Engineering for Block 8 Oil and Gas Field.
PROJECT LOCATIONDURATIONSTART DATECOMPLETION DATE
Iraq36 MonthsFeb-23Feb-26

Key Takeaways Success

  • Comprehensive E&D Services: Offered a full range of engineering and design services, encompassing studies, data analysis, project management, and administrative support to ensure a holistic approach to project execution.
  • Responsibility and Performance: Demonstrated sole responsibility for methods and techniques, prioritizing safety, quality, and technical integrity while adhering to cost and schedule constraints, ensuring optimal project performance.
  • Increased Production: Assist RN with engineering activities in increasing their production from 2,000 BOPD to 10,000 BOPD.
  • Innovation and Optimization: Utilized technology and best practices to optimize engineering processes, proactively addressing construction, commissioning, and operational challenges through innovative solutions, enhancing project efficiency.
  • HSE Integration: Integrated safety and environmental design principles throughout all phases, ensuring compliance with HSE policies, and reducing risks to As Low As Reasonably Practicable (ALARP) levels, with comprehensive incorporation of HSE recommendations into E&D documents for enhanced safety measures.

Contract Type: Engineering (GSA)
Client: RN-ZAWITA PTE. LTD.

EPC Project Summary

PROVISION OF ENGINEERING AND DESIGN SERVICES FOR THE BLOCK 9 FIELD

  • Concept, FEED and Detailed Engineering for Block 9 Oil and Gas Field.
PROJECT LOCATIONDURATIONSTART DATECOMPLETION DATE
Iraq36 MonthsFeb-23Feb-26

Key Takeaways Success

  • Feedback Integration: Actively incorporating feedback from audits to enhance project quality and safety, ensuring continuous improvement.
  • Demolition and Modification: Undertaking all necessary engineering and design for demolition and modification of existing installations as required, ensuring seamless integration with project objectives.
  • Increased Production: Assist RN with engineering activities in increasing their production from 2,000 BOPD to 10,000 BOPD.
  • Comprehensive Scheduling: Maintaining an updated activity schedule throughout the service duration, including detailed schedules for equipment, drawings, requisitions, ensuring efficient project coordination.
  • Meticulous Documentation Control: Providing meticulous documentation control and approval, including database management, discipline-specific calculations, material requisitions, and incorporating lessons learned for continuous improvement.
  • Completion Deliverables: Delivering final design calculations, operating and maintenance manuals, engineering data books, mechanical catalogues, and necessary drawings and documents in various formats, ensuring comprehensive project completion and handover to the COMPANY.

Contract Type: Engineering (GSA)
Client: DNO Iraq AS.

EPC Project Summary

PROVISION OF ENGINEERING SERVICES (BAESHIQA)

  • Perform conceptual engineering (Identify, assess, select, define) options, preparation of conceptual reports, project controls, procurement support, detailed design including all analyses, preparation of operation, maintenance, commissioning, and start-up assistance to Company’s Operations Group as required and for the provision of all records I documentation necessary for the complete performance of the Work.
  • Responsible for all aspects of the Services, regarding Health, Safety, Security and Environmental (HSSE) performance, quality management, schedule, cost, and functionality.
PROJECT LOCATIONDURATIONSTART DATECOMPLETION DATE
Iraq24 MonthsOct-22Oct-24

Key Takeaways Success

  • Conceptual Engineering: Facilitated informed decision-making by identifying, assessing, selecting, and defining options through conceptual reports, ensuring  clarity in project direction.
  • Comprehensive Support: Ensured a holistic approach to project development by providing project controls, procurement support, and detailed design with thorough analyses, maximizing project efficiency.
  • Operational Assistance: Provided operation, maintenance, commissioning, and start-up assistance to the Company’s Operations Group, accompanied by complete documentation for seamless performance transition.
  • Responsible Management: Demonstrated full accountability for HSSE performance, quality management, schedule adherence, cost control, and functionality throughout all aspects of the services provided, ensuring project success and client satisfaction.

Contract Type: Engineering (GSA)
Client: Gazprom Neft Middle East B.V.

EPC Project Summary

PROVISION OF ENGINEERING CONSULTANCY SERVICES

  • Call-Out Contract for Provision of Engineering Consultancy Services to Garmian block located in the Kurdistan Region of Iraq.
PROJECT LOCATIONDURATIONSTART DATECOMPLETION DATE
Iraq24 MonthsJul-22Jul-24

Key Takeaways Success

  • Enhanced Engineering Support: Bolstering COMPANY’s engineering capabilities through consultancy services, providing resources and technical expertise for document development, design calculations, and CAD assistance, ensuring proper design and construction of units/facilities.
  • Streamlined Procurement: Optimizing procurement activities with support in material take-offs, bid evaluation, and vendor document reviews, ensuring compliance with project requirements and standards, thereby streamlining the ordering process.
  • Effective Construction Assistance: Integrating consultancy resources into project management and engineering teams to facilitate preparation of construction scope packages, site engineering, and other deliverables, enhancing project execution and quality control.
  • Comprehensive Oversight: Monitoring vendor and contractor performance, providing technical guidance, and conducting thorough document reviews to ensure compliance with project objectives, regulations, and safety standards, contributing to project success.

Contract Type: Engineering (GSA)
Client: Gulf Keystone Petroleum International LTD.

EPC Project Summary

PROVISION OF ENGINEERING CALL-OFF SERVICES FOR PHASES 1B, 1C AND 1D

  • Provision of Engineering support on an ad-hoc Call Off basis in developing the Shaikan Field in Kurdistan Region of Iraq.
PROJECT LOCATIONDURATIONSTART DATECOMPLETION DATE
Iraq24 M + 12 M Ext
  (Optional)
Jan-22Jan-25

Key Takeaways Success

  • Comprehensive Engineering Expertise: Diverse engineering support, from process simulation to electrical load flow analysis, ensures robust technical input across project development and execution phases.
  • Increased Production: Assist GKPI with engineering activities in increasing their production from 20,000 BOPD to 110,000 BOPD.
  • Streamlined Documentation: Drafting support for key documents and preparation of design change notes ensure clear communication and documentation, facilitating efficient decision-making and project management.
  • Enhanced Design Quality: Activities such as design reviews, 3D model reviews, and stress analysis using software like CAESAR ensure the integrity and functionality of designs, optimizing equipment and system performance.